Township of Frelinghuysen

  

Assessor
Contact
Construction
Directions
Environmental
Farmland Preservation
Historical Committee
Land Use Board
Municipal Clerk
OEM
Open Space Committee
Online Forms
Recreation Committee
Residents Guide
Township Committee
Township History

Telephone:
(908) 852-4121
Fax: (908) 852-7621

Business Hours:
Monday - Friday
7:30-3:30
Closed for lunch
12:00-12:30

Mailing Address:
Township of Frelinghuysen
210 Main Street
Johnsonburg, NJ 07825


Frelinghuysen
Forest
Preserve

 

 

Frelinghuysen Township
Construction Department

Jacquelyn Mowbray
Technical Assistant to the Construction Official

210 Main Street
Johnsonburg, NJ  07825
Email: construction "at" frelinghuysen-nj.us
908-852-4121  Phone
908-852-7621 Fax

Office Hours: Monday 8:00 a.m. - 11 a.m. & Wednesday 12:30 p.m.. - 4 p.m.

Please be aware of the following change beginning January 1, 2009

Plumbing Inspections are now being done in house.  If a resident or contractor would like a Plumbing Inspection, they must call the Construction Department at 908-852-4121  ext. 2, in order to scheduled these inspections.  Be advised, no inspection request will be accepted if left on the answering machine.  Requests must be made during normal business hours of Monday & Thursday 9 am - 3 pm and Fridays 9am - 12 pm.
Inspection Schedule as follows: 

Building & Fire - Monday 10:00 a.m. - 12:00 p.m. & Thursday 8:00 a.m - 9:30 a.m.
Electrical - Monday & Wednesday 12:00 p.m. - 5:00 p.m.
Plumbing - Tuesday & Thursday call 908-319-2600 to schedule an inspection.

Call for Appointment

908-852-4121 ext. 2
908-852-4121 ext. 2
908-852-4121 ext. 2

Procedure to Build

Step by step instructions for the property owners and contractors of our Township prior to building new construction. (Download PDF Version)

Once you have ownership of the lot you plan to build on, the following steps MUST be taken:

1. Contact the Township Zoning Department. All applicants must obtain a Zoning Permit Application. Submit the completed application with a copy of your approved septic system plot plan, and pay the required application fee.

2. Contact Warren County Health Department (908) 475-7960. Apply for Septic and Well permits. You must have a valid Septic and Well Permit in order to apply for your building permit.

3. Contact Warren County Soil Conservation (908) 852-2579 to determine if a permit must be obtained.

4. If there are wetlands present on the lot, a Letter of Interpretation will be needed from the N.J.D.E.P. before a building permit is issued.

5. Certification of Taxes paid must be obtained.

After the above items are complied with, you are now ready to APPLY for Building Permits.

6. Contact the Building Department (908) 852-4121 ext. 2 - The following applications are to be filled out: Building, Electrical, Plumbing, Fire & Driveway.

SPECIAL NOTE: if a driveway opens on a State or County road, you must obtain an entrance permit from the NJDOT and Warren County Engineers Office, respectively, in addition to the Township Driveway permit.

7. Complete the building applications and submit to the Construction Department. The following copies must also be submitted in order for the application to be complete: approved zoning application; septic and well permits; soil conservation permit (if applicable); driveway permits (County & State if applicable also); Two (2) signed and sealed copies of architectural drawings for the project. An owner may draw the plans for a single family dwelling if he/she is going to reside in the building.

For Modular Dwelling Applications - all of the above information is required plus the following.

Submit written estimates showing the cost for:

  1. Foundation and footings

  2. Plumbing from the floor of the Modular to connection with the well and septic:

  3. All electric outlets, lights, special devices and services;

  4. All storage tanks;

  5. All exterior decks and entry steps

  6. All carpentry including connection, roof raising, garage framing and finishing, siding & roofing;

Submit two copies of the stamped and approved modular building. Only submit those drawings that pertain to the building you plan to construct.

Submit two copies of the sealed architectural drawings for the foundation and any items that are not part of the modular unit.

8. If plans are drawn by the owner, they must contain the following:

bullet

 All four elevations front, rear, etc.

bullet

 Foundation plan showing the following:

bullet

 Size of footings, type and thickness of walls and floor

bullet

 Size and direction of floor joists;

bullet

 Column location and girder size;

bullet

 Size and location of windows and doors. Windows must be at least equal 1/50 of floor plan;

bullet

 First and second floor plans showing windows, doors and room areas;

bullet

 Typical cross section

bullet

 Energy code checklist;

bullet

 Percentage of glass to exterior wall surface;

bullet

 Type of insulation in walls, ceilings, and floors;

bullet

 Slab on grade insulation.

Architects must show all of the above, plus:

bullet

 Total volume

bullet

 Factor of walls and ceilings

bullet

 Use group and type of construction

bullet

 Occupancy load

Plumbing, heating and electrical schematics must also be provided.

9. REVIEW - when the preceding information has been assembled, and the necessary Technical Application shave also been completed, you must submit ALL information to the Building Department at one time.

Departmental Review may take up to twenty (20) business days after FULL submission of the completed application package.

10. Additional Permits are required for:

  1. Temporary electric service

  2. Well pump and line installation

11. Required Inspections - All required inspections must be performed within four (4) business days of your call requesting the inspection. Inspection requests MUST be made 24-hours prior to inspection date. The property owner/contractor must provide the following information when requesting an inspection:

  1. Permit number

  2. Block and Lot

  3. Owners name

  4. Street location

  5. Types of inspection needed.

At the street entrance to the property, erect a sign showing the Block, Lot, Building number, permit number & name. Be sure the sign can be read clearly for Inspectors to find the property.

Required Inspections are as follows:

Footing (prior to placing concrete)
Underground/Rough Plumbing
Slab (prior to placing concrete)
Foundation and footing drains, before backfilling

Submit location survey at this point

Rough frame (before siding and roofing is applied
Rough plumbing
Rough electric
Fire
Finish frame (after rough plumbing, electric and fire approvals
Insulation

12. CERTIFICATE OF OCCUPANCY

To obtain a C.O. you must:

Complete a C.O. application
Obtain final driveway approval
Submit the final survey
Submit Certificate of Compliance for wells and septic
Submit homeowner's Warranty (if applicable)
Final inspections for: electric, plumbing, fire and building must be approved;
Pay all outstanding fees, violations, and taxes.

NO CERTIFICATE OF OCCUPANCY SHALL BE ISSUED WITHOUT ALL APPROVALS BEING OBTAINED.

NO BUILDING CAN BE USED OR OCCUPIED UNTIL A CERTIFICATE OF OCCUPANCY HAS BEEN ISSUED.

Construction Office Forms

All online forms for the Construction office are available here.

 Copyright 2007 - 2017 - Township of Frelinghuysen
For problems or questions regarding this
website please contact [webmaster "at" frelinghuysen-nj.us].